Bay Window Problems solved
The bay window of this London property was in need of costly underpinning and repairs, to rectify problems caused by inadequate foundations, along with a lack of adequate lateral restraint.
Thor Helical Remedial utilised its Shire mini piles along with Helical wire beaming and Thor Lateral Restraint Ties to complete the repairs to Local Authority Building Controls satisfaction within 2 days of commencement of the project, showing the client considerable savings on the traditional alternative. Clients requirements were further satisfied, by the provision of a 10 year warantee against future failure of the repairs.
|

Problem bay window |

Repair detail
|